Log Home Builders Association

Log homes and log cabins from scratch

  • Main Page
  • Articles
    • Featured
  • Forums
  • FAQ
    • Questions About Building Your Own
    • Questions About Our Class – Log Home Builders Association
  • Store
    • Shop
    • Cart
    • My Account
    • Track your order
    • Checkout
    • Store policies
  • Student Homes
  • About
    • Who we are
    • What we do
    • Privacy policy
    • Terms of service
    • Contact us

Pouring concrete in winter: during cold weather

August 6, 2007 by LogHomes Editor

Sometimes, out of necessity or eagerness, you may start working on the foundation of your log home in the middle of winter.  Pouring concrete during cold weather can be a little tricky, because pouring concrete in freezing temperatures can cause serious problems.  If you really want to pour concrete in winter there are some easy precautions you can take in order to help ensure that you’ll end up with a rock solid foundation.

First off, lets talk about what can happen if you pour concrete in cold weather without taking any precautions.  Concrete cures through a chemical process that both creates and requires heat.  If it cools too rapidly, due to cold weather, it can be seriously weakened (not desirable).  You can also end up with fractures in your foundation caused by water freezing within the concrete, or can have spalling problems.

Generally the kind of cold weather that can negatively impact freshly poured concrete is 3 consecutive days of 40 F or below (average temp).  Even if the temp is bouncing between the 40’s and 50’s you might still have problems.  Effective communication with your concrete supplier, and checking your local weather report, should give you the definitive answer as to whether or not you’ll need to take extra precautions against cold weather at the time of your pour.

If you do end up needing to pour concrete in cold weather, then there are several different precautions you may want to take:

1) There are ‘anti-freeze like’ admixtures that can be effective at stopping the water within concrete from freezing.   Such an admixture will extend the temperature range in which concrete can effectively cure. 

2) Air-entrainment admixtures also help concrete deal with low temperatures by trapping tiny air bubbles within the mix, which in theory gives the freezing water someplace to gather without damaging your foundation.

3) A load of concrete can also be heated prior to leaving the yard.  Starting out at a higher temp means it’ll stay warmer longer and can resist the cooling action of the cold weather long enough to form a good, solid set.

4) You can also request a mix of concrete that has extra cement added to it.  That can help the mix quickly develop the strength needed to handle freezing temperatures.

5) Order a ‘drier’ mix of concrete.  Since there will be less moisture within the mix that can freeze, the freezing effects of the temperatures will have less of an effect.

6) Use insulating blankets or insulated boxes to cover your foundation or pier blocks.  This will help trap in the heat of the concrete preventing it from cooling too quickly.  You can also use a ‘heated box’ of some sort if the weather is really cold.

When pouring in cold weather your concrete supplier will likely recommend one or more of the above precautions.  Pay attention to what the supplier recommends, because after all they are the one who will be most familiar with what works best in your area – at the time of year your doing your pour.

While waiting for spring or summer may make the construction process easier, working on your foundation in winter is sometimes possible provided you take appropriate steps.  Be sure to talk with your concrete supplier about what precautions to take.

For additional information you can check out the following resources:

http://www.askthebuilder.com/cold-weather-concrete-installation/

http://www.pathnet.org/sp.asp?id=14138

Filed Under: Articles

Sign up now

  • No classes are scheduled at this time.
  • Sign up to be notified when we schedule another class here.
Larry in Washington
Media Exposure
See log homes built by our students
Free Labor Log Homes
How To Get Free Logs

Featured Student Feedback

Student In Log Home

"Building this house has been the time of our life!! We would really like to thank LHBA for all that they did to help us achieve this amazing feat...

We are now mortgage free!!! Wow what a feeling. I never imagined that it could be done the way we did it, Mortgage free that is... 2 years ago when we sat in that classroom I never even thought that 2 years later I would be typing this in my beautiful mortgage free home...

Thank you LHBA!!!"

Steve & Gretchen Bradbury & Family
Read more about the Bradbury family project, and about their family blog here

Follow us

  • facebook
  • twitter
  • mail
  • youtube
  • pinterest
  • linkedin
  • arrow-right-alt
  • google
  • reddit

The Peter Project

The Peter Project

LHBA member Peter Andersen was diagnosed with a terminal disease half way through building his house. Click here to see how LHBA members and local companies are rallyng to help.

Online forums

Want to talk to some smart, friendly people who are also interested in building for themselves?

Join our online forums and take part in the discussion.

Popular Articles

Most popular articles:

  • Why you shouldn't buy log cabin kits
  • How to build a log cabin
  • Log cabin homes, just the facts
  • Log house at Wikipedia

What our students say

Ed and I were already anxious to start working on our log home but after this weekends class I'm more then ready to begin living this dream that NO ONE in my family seems to understand. I spent a weekend with a room full of people that felt that same desire to build thier own log home that Ed and I feel.

Patricia Last
Class of 2009-02-14

Read more

Copyright © 2019 · Log Home Builders Association. All rights reserved.

Copyright © 2019 · Log Homes V4 on Genesis Framework · WordPress · Log in